Quote comparison and landed costBeta
Compare supplier quotes on what you will actually pay.
Beta: every number is exact and explained, but it has not yet been proven on many real quotes. Check a line’s calculation before you order.
Panel build Q4
6 lines · 2 quotes · compared in USD
| Plan | Lines | Landed, USD |
|---|---|---|
Best split Allied 2 lines · Europa 4 lines | 6 of 6 | 6,584.24 Covers every line |
Everything from Allied Controls 1 line not offered | 5 of 6 | 5,598.00 |
Everything from Europa Elektro 2 lines not quoted | 4 of 6 | 5,296.24 |
Includes freight, 2.7 % duty and EUR at 1.085, the rate you entered.
How it works
- Step 1List what you need
Your SKUs and quantities, pasted from a spreadsheet.
- Step 2Add the quotes
Upload each supplier’s Excel, CSV or PDF — or send an RFQ.
- Step 3Add costs and rates
Freight, duty and other charges; exchange rates as you will pay them.
- Step 4Award and export
Pick a plan or award line by line, then export purchase lists.
What it handles
- Quantities that really apply
- Price breaks, minimum order quantities and pack or order multiples.
- Landed cost
- Freight, insurance, duty, surcharges and discounts — per order, per line, per unit or as a percentage — allocated to each line.
- Currencies you control
- Only the exchange rates you enter are used. Without a rate, offers in that currency are left out, never guessed.
- Plans and savings
- Lowest total with split purchasing, lowest per line, or one supplier for everything — savings always against a named baseline.
- Terms in view
- Validity dates, lead times, Incoterms, no-bids and partial quotes.
- Explained, then decided
- Each line’s landed cost step by step. Export the award as XLSX, with a purchase list per supplier, or CSV. Deciding never changes your costs.
Try it with your own files.
Free plan · no credit card